APPLICATION FOR THE PROPOSED RE-CONFIGURATION OF THE PORT EDWARD SUBSTATION WHICH WILL INCLUDE A COMMUNICATIONS TOWER, AS WELL AS THE ERECTION OF TWO POWER LINES FROM EROS SUBSTATION IN HARDING TO THE PORT EDWARD SUBSTATION RUNNING ON TWO SEPARATE ROUTES TROUGH PARTS OF KWAZULU NATAL AND THE EASTERN CAPE (DEAT ref# 12/12/20/987)
In order to reinforce Eskom’s existing Distribution power line network in the KwaZulu Natal and Eastern Cape, Eskom Distribution (a subsidiary of Eskom Holdings Limited) is currently proposing the establishment of two power lines from Eros Substation (Harding) to Port Edward Substation, as well as the proposed upgrade of the Port Edward Substation.